How is the Aero Mount Pro attached to the bicycle stem?Updated a month ago
The SP Connect Aero Mount Pro is attached directly to your bicycle stem using a pre-installed 3M adhesive pad.
For secure installation, the stem must provide a smooth, flat, clean and grease-free mounting surface measuring at least 55 × 30 mm.
Additional O-rings are included to provide supplementary mechanical fixation.
Step-by-Step Installation
- Prepare the mounting surface:
- Select a suitable flat mounting area on your bicycle stem measuring at least 55 × 30 mm.
- Thoroughly clean the contact surface to remove dirt, dust, grease and other residues.
- Ensure the surface is completely clean and dry before proceeding.
- Position the Aero Mount Pro:
- Determine the desired mounting position before removing the protective film from the adhesive pad.
- Check that the mount and attached smartphone will not interfere with steering, cables or other bicycle components.
- Remove the protective film and carefully position the Aero Mount Pro on the prepared surface.
- Important: The adhesive attachment is intended for a single application. Do not attempt to reposition the mount after applying it.
- Secure the adhesive attachment:
- Press the Aero Mount Pro firmly against the mounting surface for at least 30 seconds.
- Apply even pressure to ensure that the adhesive pad makes full contact with the stem.
- Ensure that the mount is correctly positioned and securely attached.
- Install the additional O-rings:
- Use the supplied O-rings to provide additional mechanical fixation around the bicycle stem.
- Position the O-rings according to the installation instructions.
- Ensure that the O-rings are correctly seated and do not interfere with bicycle components.
- Allow the adhesive to cure:
- Allow the adhesive to cure for the period specified in the product instructions before attaching your smartphone or using the mount.
- The curing process may take several hours, depending on the ambient temperature and installation conditions.
- Do not place the mount under full load until the required curing time has elapsed.
Important Mounting Requirements
- Minimum mounting area: A flat contact surface measuring at least 55 × 30 mm is required.
- Surface condition: The mounting surface must be smooth, clean, dry and free from grease.
- Surface compatibility: Round, heavily curved, uneven or textured surfaces are not suitable if they prevent full adhesive contact.
- Single-use adhesive: The original adhesive pad is intended for one installation and should not be reused after removal.
- Additional fixation: The supplied O-rings provide supplementary security and should be installed as instructed.
- Curing time: Do not attach a device or ride with the mount until the adhesive has cured sufficiently.
- Safety check: Before every ride, verify that the Aero Mount Pro is securely attached to the bicycle stem.
Further Information
For detailed installation instructions and illustrations, please refer to the following manual:
Summary
The SP Connect Aero Mount Pro is attached directly to the bicycle stem using a 3M adhesive pad, with additional security provided by the included O-rings.
Installation requires a smooth, flat, clean and grease-free surface of at least 55 × 30 mm. The mount must be pressed firmly into position for at least 30 seconds and allowed to cure before use.
Important: The adhesive pad is intended for a single application. Always verify that the mount is securely attached before riding.